返回列表 发布新帖
查看: 1603|回复: 0

梅耶博格获晶澳太阳能2500万瑞士法郎订单

发表于 2010-6-5 07:43:33 | 查看全部 |阅读模式
梅耶博格宣布晶澳太阳能签署协议,梅耶博格将为晶澳位于江苏东台的硅片工厂扩产提供其硅片切割设备,及其子公司 Hennecke Systems的检测设备。据悉,晶澳太阳能将在今年扩产,预计到今年年底新设备就能到位,届时,该工厂的硅片产能将由现在的120兆瓦提高至300兆瓦。

Meyer Burger Technology Ltd. announced today that the group members Meyer Burger Ltd and Hennecke Systems GmbH succeeded in concluding a contract for the supply of high-tech slicing- and wafer- inspection systems with China’s second biggest cell manufacturer JA Solar Holdings Co., Ltd. For the expansion of its wafer production plant in Donghai, Jiangsu Province, from 120MW to 300MW in 2010, JA Solar relies on the highly advanced slicing- and inspection-systems of Meyer Burger Ltd and Hennecke Systems GmbH and puts its confidence in the technological leadership, the international experience and the reputation of the Meyer Burger Group. The completion of the facility is expected by the end of the year 2010.

JA Solar Holdings Co., Ltd. was established in 2005 and focuses on design, development, production and sales of high-performance solar power products. The company has built two state-of-the-art solar cell manufacturing facilities in Ningjin, Hebei Province and Yangzhou, Jiangsu Province with a total capacity of over 1 GW. The capacity of its multi-crystalline silicon wafer manufacturing facility in Donghai, Jiangsu Province is planned to reach 300 MW by the end of 2010. JA Solar Holdings is committed to the research and development of high efficiency crystalline solar cell and has developed a new type of solar cell with conversion efficiency of approximately 19% through advanced process development efforts.

  
  
来源: 易恩孚
您需要登录后才可以回帖 登录 | 立即注册

本版积分规则

投诉/建议联系

爆料/投稿:8328 6054 @qq.com

举报/投诉:刘先生/158 5085 4264(微信同号) 商务/合作:夏 云/151 8971 7421(微信同号) 未经授权禁止转载,复制和建立镜像,
如有违反,追究法律责任
  • 阳匠学社
    微信公众号
  • 阳匠网
    微信公众号
阳匠网丨社区 © 2001-2025 Discuz! Team. Powered by Discuz! W1.5 苏ICP备2023010470号
关灯 在本版发帖
扫一扫添加微信客服
返回顶部
快速回复 返回顶部 返回列表